Home Project Resources

Dumpster Size Calculator

Pick the project or measure the pile. You get the smallest roll-off that fits, its real dimensions, and a weight check — because heavy debris hits the tonnage limit long before the box looks full.

What are you throwing out?

Add room for bad packing
Debris never packs the way you expect. 15% is a sensible default; use 25% if you can’t break things down.

Container

What you need

—
Debris volume—
Packing allowance—
Size for—
Cubic yards
—
Cubic feet
—
Est. weight
—
Weight against the included tonnage
—
How each size fits

Standard roll-off sizes

SizeDimensions (L × W × H)HoldsWeight includedPickup loads
10 yard12 × 8 × 3.5 ft10 yd³1–2 tons3
15 yard16 × 8 × 4 ft15 yd³1.5–2.5 tons4–5
20 yard22 × 8 × 4.5 ft20 yd³2–3 tons6
30 yard22 × 8 × 6 ft30 yd³3–4 tons9
40 yard22 × 8 × 8 ft40 yd³4–6 tons12

Dimensions vary a foot or two between companies. Width is almost always 8 ft because that is what fits on the truck, so the sizes grow in length and then in height. Full detail in our dumpster sizes guide.

Notes on the math

Volume. A cubic yard is 27 cubic feet. Project presets are typical debris volumes for a job of that size; the measurement mode is simply length × width × height divided by 27.

Weight. Each material has a rough density in pounds per cubic yard — broken concrete around 3,000, dirt around 2,200, mixed household junk around 350. Multiply by your volume and you get the load weight. That number is what decides whether you are volume-limited or weight-limited.

Why heavy debris goes in a small container. A 10-yard box full of broken concrete weighs more than a 30-yard box full of cabinets. If the calculator recommends a smaller container than you expected, the weight limit is the reason.

Estimates for planning. Confirm the included tonnage and the exact dimensions with the company before you book — both vary.