Deck & Decking0 SQ FT
= 16 ft
= 12 ft
Decking direction
Boards run parallel to the house. Diagonal decking is laid at 45 degrees, needs joists at 12 in on center for most composite, and creates far more offcut, so it defaults to 15% waste.
Framing, Footings & Railing
Footings must reach below your local frost line. 36 in is common across the northern US; many southern counties allow 12 to 24 in. Your building department sets the number, not this calculator.
Attached decks are railed on three sides. Freestanding decks are railed on all four.
A pair of 5.5 in boards with a 1/8 in gap gives an 11.125 in tread. The IRC minimum stair width is 36 in and the minimum tread run is 10 in, with risers no taller than 7.75 in.
Framing Plan1:SCALE
Joists are drawn at your real on-center spacing. Orange squares are footings.
Decking Boards To BuyLIVE
16 ft boards to buy
0 boards
Waste allowance
10% for a straight, square deck. 15% for diagonal decking or a deck with angled corners and a bump-out. 20% if you are buying a grade with knots and splits you will have to cut around.
Which Board Length Wastes Least#COMPARE
A 16 ft deck fed with 12 ft boards forces a butt joint in every row. This table is the same deck priced in all four stock lengths, so you can see the offcut before you buy.
| Board | Per row | Boards to cover | Buy with waste | Offcut |
|---|
Framing & Footings#FRAME
Railing, Stairs & Fasteners#FINISH
Materials Ticket#DECK
Enter your deck size to build the ticket.
Every quantity on the ticket already includes your waste allowance. Framing lumber is given as linear feet and as a piece count so you can buy either way.
How This Is CalculatedSHOW WORK
The assumptions, stated
Nominal is not actual. A "6 inch" deck board is 5.5 in wide and a "5/4x6" is also 5.5 in. Every board-count on this page uses the actual width plus your gap, because that is what covers the deck. Using the nominal 6 in would under-buy you by roughly 8%.
Board rows = deck depth in inches divided by (board width + gap), rounded up. The last row is almost always ripped narrower, which is normal and is why the gap value barely matters to the total.
Joists = deck length in inches divided by the on-center spacing, rounded up, plus one for the final joist. Each joist spans the deck depth. Two rim or band joists run the full length. This is a takeoff, not a span table: whether a 2x8 can actually span your depth at 16 in on center depends on species, grade and load, so check the joist span table your inspector uses.
Footings = beam lines multiplied by (beam length divided by post spacing, rounded up, plus one). Concrete per footing is the volume of a cylinder, pi x radius squared x depth. Bag yields are the printed manufacturer figures: 80 lb = 0.60 cu ft, 60 lb = 0.45 cu ft, 50 lb = 0.375 cu ft.
Screws. The rule of thumb is 350 screws per 100 sq ft, and here is where it comes from: 100 sq ft of 5.5 in boards is about 218 linear feet of board; joists at 16 in on center put a joist every 1.33 ft, giving about 164 crossings; two screws at each crossing is 328 screws. Round up for the ones you drop and you get 350. This calculator uses your real geometry rather than the rule, so it will differ slightly, and it uses the rule as a cross-check.
Hidden fasteners are counted separately because they work differently: one clip sits in the groove at every joist crossing, so you need roughly board rows multiplied by joists, and the first and last board still get face-screwed. Manufacturer box counts vary a lot, so buy by the clip count and check the box coverage.
Concrete volumes here are for footings only. For a slab, pad or pier with a form, use the concrete calculator. For pricing the whole job, see deck cost.
Deck Quick ReferenceSCREENSHOT ME
Nominal vs actual lumber sizes
| Nominal | Actual (dry, surfaced) | Boards to cover 12 ft of depth |
|---|---|---|
| 2x4 / 5/4x4 | 1.5 x 3.5 in | 40 rows |
| 2x6 / 5/4x6 | 1.5 x 5.5 in | 26 rows |
| 2x8 | 1.5 x 7.25 in | 20 rows |
| 2x10 | 1.5 x 9.25 in | 16 rows |
| 2x12 | 1.5 x 11.25 in | 13 rows |
| 4x4 post | 3.5 x 3.5 in | — |
| 6x6 post | 5.5 x 5.5 in | — |
Concrete per footing
| Hole | Cu ft | 80 lb bags | 60 lb bags | 50 lb bags |
|---|---|---|---|---|
| 8 in x 24 in | 0.87 | 2 | 2 | 3 |
| 10 in x 30 in | 1.36 | 3 | 4 | 4 |
| 10 in x 36 in | 1.64 | 3 | 4 | 5 |
| 12 in x 36 in | 2.36 | 4 | 6 | 7 |
| 12 in x 42 in | 2.75 | 5 | 7 | 8 |
| 12 in x 48 in | 3.14 | 6 | 7 | 9 |
| 16 in x 48 in | 5.59 | 10 | 13 | 15 |
Stair riser and tread combinations
| Deck height | Risers | Riser height | Treads | Total run at 11 in |
|---|---|---|---|---|
| 18 in | 3 | 6.00 in | 2 | 22 in |
| 24 in | 4 | 6.00 in | 3 | 33 in |
| 30 in | 4 | 7.50 in | 3 | 33 in |
| 36 in | 5 | 7.20 in | 4 | 44 in |
| 48 in | 7 | 6.86 in | 6 | 66 in |
| 60 in | 8 | 7.50 in | 7 | 77 in |
| 72 in | 10 | 7.20 in | 9 | 99 in |
Finish The Estimate
Deck Calculator FAQ
How many deck boards do I need for a 16x12 deck?
With standard 5.5 in boards and a 1/8 in gap you need 26 rows running the 16 ft length. Buy 16 ft boards and that is 26 boards to cover it, or 29 boards once you add a 10% waste allowance. The deck is 192 sq ft and the decking itself is 416 linear feet of board.
Buy 12 ft boards instead and the math changes badly: every row needs two boards, so 52 boards, 624 linear feet purchased for 416 feet of deck. Always check the board length comparison table above before you load the cart.
Should joists be 12, 16 or 24 inches on center?
16 in on center is the default for pressure treated 5/4 and 2x decking and for most composite brands laid straight. 12 in on center is required for diagonal decking on nearly every composite, because a 45 degree board spans 1.41 times the joist spacing, and it is also common under decking laid over a stair landing.
24 in on center only works with full 2x decking, and even then it feels bouncy and most composite manufacturers void the warranty. Check the specific product's installation sheet, since the spacing rule comes from the decking manufacturer, not from the joist span table.
How deep do deck footings need to be?
Below the frost line, and the frost line is set by your local building department. It ranges from essentially zero in southern Florida and coastal California to 42 in or more across Minnesota, North Dakota and northern Maine, with 36 in common across the northern half of the country and 12 to 24 in usual through the south.
Do not guess. Call the building department or check your county's adopted code amendments, because if the footing is shallow the deck will heave, pull on the ledger and rack the railing. A freestanding deck on a shallow pad forgives frost heave far better than an attached one does.
How many screws per deck board?
Two screws at every joist crossing. For a 16 ft board over joists at 16 in on center that is 13 crossings and 26 screws per board. Across a whole deck it works out to roughly 350 screws per 100 sq ft, which is where the rule of thumb comes from, and this calculator shows the exact number for your geometry alongside it.
Hidden fasteners are counted differently. One clip goes in the groove at every joist, so the clip count is close to board rows multiplied by joists, and you still face-screw the first and last board plus anywhere a board butts. Buy the fascia screws separately in a color-matched head.
Do I add waste to deck boards if I can use the offcuts?
Yes, and here is the distinction this calculator makes that most do not. The offcut column in the board length table is material you pay for and cut off because the stock length does not divide into your deck. That is geometry and it is predictable. The waste allowance on top of it covers the unpredictable part: a board with a bad crook, a split end, a miscut, a stair tread you have to redo.
Offcuts from the length mismatch are usually too short to be useful in a field of full-length rows, but they are perfect for stair treads, the fascia, and blocking. Keep them and buy the 10% anyway.
Does this include the ledger, flashing and hardware?
The ledger is counted in the framing linear feet when you set the deck as attached to the house. Flashing, ledger bolts, joist hangers, post bases and post caps are not counted, because the quantity depends on the specific hardware system you choose and the fastener schedule that comes with it.
As a planning figure: one joist hanger per joist end that lands on the ledger or a beam face, one post base and one post cap per post, and a structural screw or through-bolt roughly every 16 in along the ledger in a staggered pattern. The exact ledger fastener spacing is in the manufacturer's table and depends on joist span and species, so pull that table rather than using a rule of thumb.